Project Planning and Conceptualization
Site Survey
Load analysis
Preliminary Plant Design
Component Selection
Final Approval of Plant Design and Drawing
Project Implementation and Construction
Assembling of Structures
Mounting of Modules
Assembly of Inverters and Battery(If Applicable)
Connection of balance of BOM
Pre commissioning Testing
Final Commissioning
Project Operation and Maintenance
Performance Testing
Continuous Monitoring
Trouble Shooting
Preparation of Generation Reports
 
Procedure to get MNRE Subsidy
- Understanding customer requirements and Load   calculation, Backup of the System.
- Submisssion of Quotation to customer as per   load requirements
- Customer raises PO in favour of Tapan Solar   Energy Pvt. Ltd.
- System Design
- Filling of DPR with MNRE by Tapan Solar Energy
- Project Execution form Tapan Solar Energy Pvt.   Ltd. on receipt of sanction letter from MNRE
- Project execution time - 45 days approx on   approval of the Project from MNRE